Putra, Arie Wiranata (2018) Usulan Pemberian Reward Dan Sanksi Kepada Karyawan Dengan Menggunakan Waktu Baku Pada Produk Full Slab PT Waskita Beton Precast Plant Gasing. Other. Perpustakaan Universitas Katolik Musi Charitas. (Unpublished)
Text
KP-TI-2018-1512007-cover.pdf Download (47kB) |
|
Text
KP-TI-2018-1512007-abstract.pdf Download (6kB) |
|
Text
KP-TI-2018-1512007-tableofcontent.pdf Download (61kB) |
|
Text
KP-TI-2018-1512007-chapter1.pdf Download (335kB) |
|
Text
KP-TI-2018-1512007-chapter2.pdf Restricted to Registered users only Download (262kB) |
|
Text
KP-TI-2018-1512007-chapter3.pdf Restricted to Registered users only Download (260kB) |
|
Text
KP-TI-2018-1512007-chapter4.pdf Restricted to Registered users only Download (400kB) |
|
Text
KP-TI-2018-1512007-chapter5.pdf Restricted to Registered users only Download (738kB) |
|
Text
KP-TI-2018-1512007-conclusion.pdf Download (35kB) |
|
Text
KP-TI-2018-1512007-reference.pdf Download (9kB) |
|
Text
KP-TI-2018-1512007-attachment.pdf Restricted to Registered users only Download (1MB) |
|
Text
KP-TI-2018-1512007-complete.pdf Restricted to Repository staff only Download (3MB) |
Abstract
PT. Waskita Beton Precast is one company that manufactures full slab type precast concrete in Indonesia. To find out the time needed in all processes, it is necessary to calculate the standard time which later can become a reference in giving rewards and sanctions. To simplify the calculation of standard time, steps that must be taken are data collection, uniformity test and data adequacy test, then calculating cycle time, normal time, standard time and standard output. The calculation results of each process are 223.83 minutes iron and strand installation, molding process 172.20 minutes, stressing strand process 66.96 minutes, reinforcement installation 86.33 minutes, checking and repair 69.01 minutes, casting 541.99 minutes, waiting time 886 , 73 minutes, demoulding and strand 89.37 minutes, handling and lubrication 114.82 minutes. The total standard time for 1 product is 2251.27 minutes and the standard output of full slab products is 192 units / month. So that workers can get rewards if they produce more than 192 units and sanctions if production is less than 192 units.
Item Type: | Monograph (Other) |
---|---|
Additional Information: | Kerja Praktik Lengkap dapat dibaca pada Komputer Katalog di Ruang Sirkulasi Perpustakaan UKMC Kampus Bangau. |
Uncontrolled Keywords: | full slab, standard time, standard output, reward. |
Subjects: | Q Science > Q Science (General) |
Divisions: | Report on Practical Work > Industrial Engineering Study Program |
Depositing User: | Perpustakaan Unika Musi Charitas |
Date Deposited: | 29 Jan 2019 02:31 |
Last Modified: | 29 Jan 2019 02:31 |
URI: | http://eprints.ukmc.ac.id/id/eprint/1980 |
Actions (login required)
View Item |