Angraini, Shinta (2020) PENENTUAN LAMA WAKTU ISTIRAHAT BERDASARKAN PENDEKATAN FISIOLOGIS (STUDI KASUS BENGKEL BINTANG BARU). Undergraduate thesis, Universitas Katolik Musi Charitas.
Text (Cover)
TI-2020-1612016-COVER.pdf Download (632kB) |
|
Text (Abstract)
TI-2020-1612016-ABSTRAK.pdf Restricted to Registered users only Download (144kB) | Request a copy |
|
Text (Tableofcontent)
TI-2020-1612016 TABELOFCONTENT.pdf Restricted to Registered users only Download (40kB) | Request a copy |
|
Text (Chapter1)
TI-2020-1612016-CHAPTER 1.pdf Restricted to Registered users only Download (273kB) | Request a copy |
|
Text (Chapter2)
TI-2020-1612016-CHAPTER 2.pdf Restricted to Registered users only Download (497kB) | Request a copy |
|
Text (Chapter3)
TI-2020-1612016-CHAPTER 3.pdf Restricted to Registered users only Download (507kB) | Request a copy |
|
Text (Chapter4)
TI-2020-1612016-CHAPTER 4.pdf Restricted to Registered users only Download (947kB) | Request a copy |
|
Text (Chapter5)
TI-2020-1612016-CHAPTER 5.pdf Restricted to Registered users only Download (296kB) | Request a copy |
|
Text (Conclusion)
TI-2020-1612016-CONCLUSION.pdf Restricted to Registered users only Download (147kB) | Request a copy |
|
Text (Reference)
TI-2020-1612016-REFERENCE.pdf Restricted to Registered users only Download (257kB) | Request a copy |
|
Text (Attachment)
TI-2020-1612016-ATTACHMENT.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (Complete)
TI-2020-1612016-COMPLETE.pdf Restricted to Repository staff only Download (5MB) | Request a copy |
|
Text (Summary_id)
TI-2020-1612016-summary_id.pdf Restricted to Registered users only Download (486kB) | Request a copy |
Abstract
Bintang Baru Workshop is a workshop engaged in the automotive sector, especially trucks and welding the car body. Existing work processes in this workshop are a decrease in car engines, car oil changes, and welding the car body, especially on truck cars. Workers who are too tired have also fallen asleep while welding the back of a truck and are almost hurting themselves. Therefore, in this study calculating the optimal workload and rest periods for workers and exchanging each rest hour so that skilled workers get the proper rest time and get enough energy to do the work. The analysis was carried out by identifying the rest periods and energy consumption at the engine drop station and the car body welding. So that after the implementation of the planning of the break time can minimize the occurrence of excess workload and can be calculated the level of productivity seen from the number of hours lost before implementation worth 0.90222, 0.88888, and 0.91769 then after implementation worth 0.92000, 0.91452 and 0.93827. Keyword : Resting Time,Workload, Produktivity, Physiological.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Resting Time,Workload, Produktivity, Physiological |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering T Technology > TJ Mechanical engineering and machinery |
Divisions: | Theses - S1 > Industrial Engineering Study Program |
Depositing User: | Users 1127 not found. |
Date Deposited: | 18 Sep 2020 03:22 |
Last Modified: | 18 Sep 2020 09:00 |
URI: | http://eprints.ukmc.ac.id/id/eprint/4561 |
Actions (login required)
View Item |