Penentuan Upah Pekerja Pada Industri Peyek Berdasarkan Pengukuran Kerja Work Sampling (Studi Kasus: Home Industry Peyek Ibu Dewi)

., Siske (2014) Penentuan Upah Pekerja Pada Industri Peyek Berdasarkan Pengukuran Kerja Work Sampling (Studi Kasus: Home Industry Peyek Ibu Dewi). Other thesis, Sekolah Tinggi Teknik Musi.

[img] Text
TI-2014-210003-cover.pdf

Download (52kB)
[img] Text
TI-2014-210003-abstract.pdf

Download (13kB)
[img] Text
TI-2014-210003-tableofcontent.pdf

Download (105kB)
[img] Text
TI-2014-210003-chapter1.pdf

Download (128kB)
[img] Text
TI-2014-210003-chapter2.pdf
Restricted to Repository staff only

Download (755kB) | Request a copy
[img] Text
TI-2014-210003-chapter3.pdf
Restricted to Repository staff only

Download (105kB) | Request a copy
[img] Text
TI-2014-210003-chapter4.pdf
Restricted to Repository staff only

Download (676kB) | Request a copy
[img] Text
TI-2014-210003-chapter5.pdf
Restricted to Repository staff only

Download (175kB) | Request a copy
[img] Text
TI-2014-210003-conclusion.pdf

Download (29kB)
[img] Text
TI-2014-210003-reference.pdf

Download (57kB)
[img] Text
TI-2014-210003-attachment.pdf
Restricted to Repository staff only

Download (600kB) | Request a copy
[img] Text
TI-2014-210003-complete.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
TI-2014-210003-summary_id.pdf
Restricted to Repository staff only

Download (138kB) | Request a copy

Abstract

Ibu Dewi peyek home industry is a businesses in the peyek food field. There is of peyek that produced in Ibu Dewi’s home indusrty, peyek kacang. Increasing the peyek demand, Ibu Dewi unable to fulfill all of peyek order. On the week days she is often working normal overtime until over the standart limit of human working time base on labour act. She also have to reject up to 15.000 pieces peyek order during the holiday. To fulfill the order of peyek and helping resolve her problem, Ibu Dewi plans to recruit a worker. Therefore, performed an analysis to determine the appropriate employee payment for Ibu Dewi worker that working at her Peyek Home Industry. The payment calculation is based on the hourly standart output from work sampling time method. The Standart output is 104 peyek in one hour. Payment for one peyek is Rp. 38. Ibu Dewi’s profit is Rp. 108.825. If she uses worker, and fulfill all the orders, her profit can increase to Rp. 178.036

Item Type: Thesis (Other)
Additional Information: Skripsi Lengkap dapat dibaca di Ruang Referensi Perpustakaan UKMC Kampus Bangau.
Uncontrolled Keywords: standart output, employee salary, work sampling method.
Subjects: Q Science > Q Science (General)
Divisions: Theses - S1 > Industrial Engineering Study Program
Depositing User: Perpustakaan Unika Musi Charitas
Date Deposited: 14 Dec 2018 00:59
Last Modified: 14 Dec 2018 00:59
URI: http://eprints.ukmc.ac.id/id/eprint/1784

Actions (login required)

View Item View Item