Vincent, Marcellino Fernando (2023) USULAN PERBAIKAN TATA LETAK LANTAI PRODUKSI PADA PABRIK BIHUN CAP UDANG BINTANG DENGAN METODE CRAFT. Working Paper. Perpustakaan Universitas Katolik Musi Charitas Palembang. (Submitted)
Text (Cover)
KP-TI-2023-1912012-cover.pdf Download (82kB) |
|
Text (abstract)
KP-TI-2023-1912012-abstract.pdf Restricted to Registered users only Download (33kB) | Request a copy |
|
Text (tableofcontent)
KP-TI-2023-1912012-tableofcontent.pdf Restricted to Registered users only Download (221kB) | Request a copy |
|
Text (chapter1)
KP-TI-2023-1912012-chapter1.pdf Restricted to Registered users only Download (241kB) | Request a copy |
|
Text (chapter2)
KP-TI-2023-1912012-chapter2.pdf Restricted to Registered users only Download (260kB) | Request a copy |
|
Text (chapter3)
KP-TI-2023-1912012-chapter3.pdf Restricted to Registered users only Download (81kB) | Request a copy |
|
Text (chapter4)
KP-TI-2023-1912012-chapter4.pdf Restricted to Registered users only Download (107kB) | Request a copy |
|
Text (Conclusion)
KP-TI-2023-1912012-chapter5.pdf Restricted to Registered users only Download (914kB) | Request a copy |
|
Text (attachment)
KP-TI-2023-1912012-attachment.pdf Restricted to Registered users only Download (745kB) | Request a copy |
|
Text (complete)
KP-TI-2023-1912012-complete.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
Bihun Cap Udang Bintang factory is engaged in the production of bihun under the brand of Cap Udang Bintang. Because the work stations are too close each other, it is necessary to adjust the distance between machines based on their placement. The method used in this study is the CRAFT (Computerizer Relative Allocation of Facilities Technique) method so that it can provide optimal solutions in terms of material handling costs with input from data from to chart (FTC) and rectilinear distance calculations to produce facility layouts with mileage short one. The results of the proposed layout can minimize the distance and material handling costs for 1 working day of 7,500 m and Rp. 8,890.00. Keyword : CRAFT Method, material handling cost , from to chart, facility layout
Item Type: | Monograph (Working Paper) |
---|---|
Uncontrolled Keywords: | CRAFT Method ; material handling cost ; from to chart ; facility layout |
Subjects: | T Technology > TJ Mechanical engineering and machinery |
Divisions: | Report on Practical Work > Industrial Engineering Study Program |
Depositing User: | Users 2296 not found. |
Date Deposited: | 17 Feb 2023 09:30 |
Last Modified: | 17 Apr 2023 06:42 |
URI: | http://eprints.ukmc.ac.id/id/eprint/9366 |
Actions (login required)
View Item |