Perancangan Alat Angkut Kerupuk Dan Kemplang Yang Ergonomis

Kowara, Kenny (2016) Perancangan Alat Angkut Kerupuk Dan Kemplang Yang Ergonomis. Other thesis, Universitas Katolik Musi Charitas Palembang.

[img] Text
TI-2016-1212002-cover.pdf

Download (145kB)
[img] Text
TI-2016-1212002-abstract.pdf

Download (209kB)
[img] Text
TI-2016-1212002-tableofcontent.pdf

Download (1MB)
[img] Text
TI-2016-1212002-chapter1.pdf

Download (664kB)
[img] Text
TI-2016-1212002-chapter2.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
TI-2016-1212002-chapter3.pdf
Restricted to Repository staff only

Download (664kB) | Request a copy
[img] Text
TI-2016-1212002-chapter4.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] Text
TI-2016-1212002-chapter5.pdf
Restricted to Repository staff only

Download (440kB) | Request a copy
[img] Text
TI-2016-1212002-conclusion.pdf

Download (115kB)
[img] Text
TI-2016-1212002-reference.pdf

Download (209kB)
[img] Text
TI-2016-1212002-attachment.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text
TI-2016-1212002-complete.pdf
Restricted to Repository staff only

Download (3MB) | Request a copy
[img] Text
TI-2016-1212002-summary_id.pdf
Restricted to Repository staff only

Download (971kB) | Request a copy

Abstract

Kerupuk and Kemplang 503 Factory owned by Mr. Anthony Salim had problems in the process of transporting the finished product to the warehouse. This is due to the decline at the time of delivery of the product from the production site to the warehouse, it requires new transportation means to solve the problem. The transportation tool newly designed and made by the method of Appropriate Technology is considering aspects of worker’s anthropometry. This tool has a dimension of 247cm x 76cm x 73cm and there on the left and right brake handle conveyances, conveyances also include oil drainer on the body conveyances, the cost to manufacture these tool is Rp.1.860.000, -. That has Payback Period in 2 days and Break Event Point Rp. 17.646.058,-. The existence of these tools can reduce worker in the process of transporting the crackers and kemplang using 1 worker. The processing time needed for the process of draining and transporting kerupuk and kemplang to shed the old tool is ±8 minutes, whereas with this new toll only takes 7±minutes. Once the tool is created and can be produced with a large amount in order to assist UKM of kerupuk and kemplang or the other UKM food.

Item Type: Thesis (Other)
Additional Information: Skripsi Lengkap dapat dibaca di Ruang Referensi Perpustakaan UKMC Kampus Bangau.
Uncontrolled Keywords: Transportation Tools, Appropriate Technology, Payback Period, Time Process.
Subjects: T Technology > TT Handicrafts Arts and crafts
Divisions: Theses - S1 > Industrial Engineering Study Program
Depositing User: Perpustakaan Unika Musi Charitas
Date Deposited: 02 Mar 2018 17:11
Last Modified: 03 Mar 2018 10:05
URI: http://eprints.ukmc.ac.id/id/eprint/927

Actions (login required)

View Item View Item