PERBAIKAN WAKTU KERJA MEKANIK DENGAN PENDEKATAN 5S DAN WAKTU BAKU DI BENGKEL REA MOTOR

Krisnajaya, Kevin (2022) PERBAIKAN WAKTU KERJA MEKANIK DENGAN PENDEKATAN 5S DAN WAKTU BAKU DI BENGKEL REA MOTOR. Undergraduate thesis, Universitas Katolik Musi Charitas Palembang.

[img] Text (Cover)
TI-2018-1812028-Cover.pdf

Download (432kB)
[img] Text (Abstract)
TI-2018-1812028-Abstract.pdf
Restricted to Registered users only

Download (45kB) | Request a copy
[img] Text (Tabel Of Content)
TI-2018-1812028-Tabel Of Content.pdf
Restricted to Registered users only

Download (89kB) | Request a copy
[img] Text (Chapter 1)
TI-2018-1812028-Chapter 1.pdf
Restricted to Registered users only

Download (218kB) | Request a copy
[img] Text (Chapter 2)
TI-2018-1812028-Chapter 2.pdf
Restricted to Registered users only

Download (185kB) | Request a copy
[img] Text (Chapter 3)
TI-2018-1812028-Chapter 3.pdf
Restricted to Registered users only

Download (128kB) | Request a copy
[img] Text (Chapter 4)
TI-2018-1812028-Chapter 4.pdf
Restricted to Registered users only

Download (816kB) | Request a copy
[img] Text (Chapter 5)
TI-2018-1812028-Chapter 5.pdf
Restricted to Registered users only

Download (104kB) | Request a copy
[img] Text (Conclusion)
TI-2018-1812028-Conclusion.pdf
Restricted to Registered users only

Download (94kB) | Request a copy
[img] Text (Reference)
TI-2018-1812028-Reference.pdf
Restricted to Registered users only

Download (91kB) | Request a copy
[img] Text (Attachment)
TI-2018-1812028-Attachment.pdf
Restricted to Registered users only

Download (452kB) | Request a copy
[img] Text (Complete)
TI-2018-1812028-complete.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy
[img] Text (Summary_id)
TI-2018-1812028-summary_id.pdf
Restricted to Registered users only

Download (696kB) | Request a copy

Abstract

Rea Motor Workshop is a business engaged in automotive and two-wheeled vehicle services that sells parts or components of the vehicle itself. Currently, the Rea Motor Workshop business does not yet have a good work area and does not have a Standard Operating Procedure to apply, seen from the lack of arrangement of the goods used, the tools scattered on the floor, to the idle time performed by mechanics. One way to fix this problem is to apply the 5S Method and Standard Time with the aim of creating a cleaner and neater work environment and mechanics can work effectively. To calculate the standard output, it is obtained from the length of working hours divided by the standard time. For the results obtained before light service repairs with 16 jobs, replacing spare parts 15 jobs, and changing oil 42 jobs. Meanwhile, after the repair, the results of light servicing were 18 jobs, replacing spare parts 16 jobs, and changing oil 50 jobs. This means that there is an increase in employment that occurs in the three categories after the improvement is financial. For the SOP, there are six important points that will be applied in the workshop. Keyword : Standard Operating Procedure, 5S Method, Raw Time, Standard Output

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Standard Operating Procedure ; 5S Method ; Raw Time ; Standard Output
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
T Technology > TS Manufactures
Divisions: Theses - S1 > Industrial Engineering Study Program
Depositing User: Kevin Krisnajaya
Date Deposited: 31 Aug 2022 07:19
Last Modified: 28 Sep 2022 03:39
URI: http://eprints.ukmc.ac.id/id/eprint/8876

Actions (login required)

View Item View Item