Andika, Ivan Albertus (2022) ANALISIS OUTPUT PRODUKSI KURSI RODA DI PT SHIMA PRIMA UTAMA DENGAN METODE TIME STUDY. Working Paper. Perpustakaan Universitas Katolik Musi Charitas, Palembang. (Submitted)
Text (Cover)
KP-TI-2021-1812007-cover.pdf Download (425kB) |
|
Text (Abstract)
KP-TI-2021-1812007-abstract.pdf Restricted to Registered users only Download (6kB) | Request a copy |
|
Text (Tableofcontent)
KP-TI-2021-1812007-tableofcontent.pdf Restricted to Registered users only Download (356kB) | Request a copy |
|
Text (Chapter1)
KP-TI-2021-1812007-chapter1.pdf Restricted to Registered users only Download (181kB) | Request a copy |
|
Text (Chapter2)
KP-TI-2021-1812007-chapter2.pdf Restricted to Registered users only Download (281kB) | Request a copy |
|
Text (Chapter3)
KP-TI-2021-1812007-chapter3.pdf Restricted to Registered users only Download (583kB) | Request a copy |
|
Text (Chapter4)
KP-TI-2021-1812007-chapter4.pdf Restricted to Registered users only Download (335kB) | Request a copy |
|
Text (Chapter5)
KP-TI-2021-1812007-chapter5.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (Conclusion)
KP-TI-2021-1812007-conclusion.pdf Restricted to Registered users only Download (146kB) | Request a copy |
|
Text (Reference)
KP-TI-2021-1812007-reference.pdf Restricted to Registered users only Download (11kB) | Request a copy |
|
Text (Attachment)
KP-TI-2021-1812007-attachment.pdf Restricted to Registered users only Download (2MB) | Request a copy |
|
Text (Complete)
KP-TI-2021-1812007-complete.pdf Restricted to Repository staff only Download (5MB) | Request a copy |
Abstract
Working time measurement gives management a way to measure the time it takes to run one operation/series of operations, so that ineffective time is found which is then separated from effective time. In this study, the proposed target for wheelchair production at PT Shima Prima Utama uses the downtime method which aims to determine the specified target and standard time for each wheelchair production. The standard time required for PT Shima Prima Utama to produce wheelchairs is 20136,35 seconds per wheelchair, for wheelchair production at PT Shima Prima Utama is 1 units of wheelchairs per day from July to September 2021. Keywords: timestudy, cycle time, normal time, standard time.
Item Type: | Monograph (Working Paper) |
---|---|
Uncontrolled Keywords: | timestudy, cycle time, normal time, standard time. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Divisions: | Report on Practical Work > Industrial Engineering Study Program |
Depositing User: | Ivan Albertus Andika |
Date Deposited: | 22 Feb 2022 04:11 |
Last Modified: | 22 Feb 2022 04:11 |
URI: | http://eprints.ukmc.ac.id/id/eprint/6978 |
Actions (login required)
View Item |