Perancangan Alat Potong Kemplang Dengan Metode Value Engineering

Harun, Hendra (2013) Perancangan Alat Potong Kemplang Dengan Metode Value Engineering. Other thesis, Sekolah Tinggi Teknik Musi.

[img] Text
TI-2013-209003-cover.pdf

Download (92kB)
[img] Text
TI-2013-209003-abstract.pdf

Download (5kB)
[img] Text
TI-2013-209003-tableofcontent.pdf

Download (86kB)
[img] Text
TI-2013-209003-chapter1.pdf

Download (219kB)
[img] Text
TI-2013-209003-chapter2.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
TI-2013-209003-chapter3.pdf
Restricted to Repository staff only

Download (220kB)
[img] Text
TI-2013-209003-chapter4.pdf
Restricted to Repository staff only

Download (1MB)
[img] Text
TI-2013-209003-chapter5.pdf
Restricted to Repository staff only

Download (292kB)
[img] Text
TI-2013-209003-conclusion.pdf

Download (72kB)
[img] Text
TI-2013-209003-reference.pdf

Download (73kB)
[img] Text
TI-2013-209003-attachment.pdf
Restricted to Repository staff only

Download (2MB)
[img] Text
TI-2013-209003-complete.pdf
Restricted to Repository staff only

Download (4MB)
[img] Text
TI-2013-209003-summary_id.pdf
Restricted to Repository staff only

Download (492kB)

Abstract

Home Industry Kemplang and Crackers "199" has obstacles such as product defects generated during the cutting process kemplang and time pieces were deemed old enough. Because of these problems, it will dirancangan kemplang cutting tools by using value engineering. Kemplang cutting process originally used the knife. Product defects produced per day was 10.8 kilograms. Time to cut a piece kemplang was 1.8 minutes. Observations were made for 12 days. Due to problems that occurred, the researchers designed a cutting tool that can help menggurangi problems that occur in the home industry. Once finished cutting tools are designed, furthermore the researcher implements cutting tools. The results obtained from the product defect is 5.48. Pounds and cut time to 0.87 minutes

Item Type: Thesis (Other)
Additional Information: Skripsi Lengkap dapat dibaca di Ruang Referensi Perpustakaan UKMC Kampus Bangau.
Uncontrolled Keywords: value enginerring, defective products, design tools, kemplang, time pieces.
Subjects: T Technology > TT Handicrafts Arts and crafts
Divisions: Theses - S1 > Industrial Engineering Study Program
Depositing User: Perpustakaan Unika Musi Charitas
Date Deposited: 07 Jan 2019 04:19
Last Modified: 07 Jan 2019 04:19
URI: http://eprints.ukmc.ac.id/id/eprint/1813

Actions (login required)

View Item View Item