Perbaikan Area Kerja Menggunakan 5S Guna Mempercepat Kerja Mekanik Pada Bengkel Aldo Motor

Sinaga, Deo Andreas (2024) Perbaikan Area Kerja Menggunakan 5S Guna Mempercepat Kerja Mekanik Pada Bengkel Aldo Motor. Undergraduate thesis, Unversitas Katolik Musi Charitas.

[img] Text (Cover)
TI-2024-2012021-Cover.pdf

Download (1MB)
[img] Text (Abstract)
TI-2024-2012021-Abstract.pdf
Restricted to Registered users only

Download (63kB) | Request a copy
[img] Text (Tableofcontent)
TI-2024-2012021-Tableofcontent.pdf
Restricted to Registered users only

Download (625kB) | Request a copy
[img] Text (Chapter1)
TI-2024-2012021-Chapter1.pdf
Restricted to Registered users only

Download (632kB) | Request a copy
[img] Text (Chapter2)
TI-2024-2012021-Chapter2.pdf
Restricted to Registered users only

Download (888kB) | Request a copy
[img] Text (Chapter3)
TI-2024-2012021-Chapter3.pdf
Restricted to Registered users only

Download (637kB) | Request a copy
[img] Text (Chapter4)
TI-2024-2012021-Chapter4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Chapter5)
TI-2024-2012021-Chapter5.pdf
Restricted to Registered users only

Download (504kB) | Request a copy
[img] Text (Conclusion)
TI-2024-2012021-Conclusion.pdf
Restricted to Registered users only

Download (386kB) | Request a copy
[img] Text (Reference)
TI-2024-2012021-Reference.pdf
Restricted to Registered users only

Download (402kB) | Request a copy
[img] Text (Attachment)
TI-2024-2012021-Attachment.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Complete)
TI-2024-2012021-complete.pdf
Restricted to Repository staff only

Download (5MB) | Request a copy
[img] Text (Summary)
TI-2024-2012021-summary.pdf
Restricted to Registered users only

Download (522kB) | Request a copy

Abstract

Aldo Motor Workshop is an automotive service business that is engaged in repairing 2-wheeled vehicles. It is known that Aldo Motor Workshop has an untidy work area where the workshop equipment is not arranged neatly according to their respective functions, and there is also a lot of used oil bins scattered around. and not throwing away, and also the arrangement of goods in the workshop is not implemented well. The Aldo Motor Workshop also does not have Standard Operating Procedures to apply. To overcome problems at the location, the 5S method is implemented which aims to create a neater, cleaner, more comfortable work area and mechanics during work so that the work is effective. To calculate standard time, the length of working hours a day is divided by the standard time. And the results obtained before repairs were 38 oil changes, 7 spare parts replacements, and 14 light services. Meanwhile, after carrying out repairs to the work area, the results were 53 oil changes, 8 spare part replacements, and 18 light services. For the SOP created there are several important points that will be implemented in the workshop. Keywords: 5S method, Standard Output, Standard Operating Procedure

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: 5S method, Standard Output, Standard Operating Procedure
Subjects: T Technology > TD Environmental technology. Sanitary engineering
T Technology > TJ Mechanical engineering and machinery
Divisions: Theses - S1 > Industrial Engineering Study Program
Depositing User: Deo Andreas Sinaga
Date Deposited: 18 Sep 2024 07:45
Last Modified: 31 Oct 2024 02:35
URI: http://eprints.ukmc.ac.id/id/eprint/13030

Actions (login required)

View Item View Item