Novianto, Philipus Fredy (2023) ANALISIS PENGENDALIAN BAHAN BAKU GYPSUM MENGGUNAKAN METODE MINMAX DI PT SEMEN BATURAJA (PERSERO) Tbk. Working Paper. Perpustakaan Universitas Katolik Musi Charitas Palembang. (Submitted)
Text (Cover)
KP-TI-2022-1912005-Cover.pdf Download (270kB) |
|
Text (Abstract)
KP-TI-2022-1912005-Abstract.pdf Restricted to Registered users only Download (128kB) |
|
Text (Tabel Of Content)
KP-TI-2022-1912005-Tabel Of Content.pdf Restricted to Registered users only Download (347kB) |
|
Text (Chapter 1)
KP-TI-2022-1912005-Chapter 1.pdf Restricted to Registered users only Download (364kB) |
|
Text (Chapter 2)
KP-TI-2022-1912005-Chapter 2.pdf Restricted to Registered users only Download (828kB) |
|
Text (Chapter 3)
KP-TI-2022-1912005-Chapter 3.pdf Restricted to Registered users only Download (293kB) |
|
Text (Chapter 4)
KP-TI-2022-1912005-Chapter 4.pdf Restricted to Registered users only Download (365kB) |
|
Text (Conclusion)
KP-TI-2022-1912005-Conclusion.pdf Restricted to Registered users only Download (436kB) |
|
Text (Reference)
KP-TI-2022-1912005-Reference.pdf Restricted to Registered users only Download (156kB) |
|
Text (Attachment)
KP-TI-2022-1912005-Attachment.pdf Restricted to Registered users only Download (859kB) |
|
Text (Complete)
KP-TI-2022-1912005-Complete.pdf Restricted to Repository staff only Download (3MB) |
Abstract
PT. Semen Baturaja (Persero) Tbk. is one of the companies engaged in the cement industry sector. The process of making cement itself before being sold is divided into 6 main processes, namely mining of limestone and clay, crushing, mixing of materials, burning to become clinker, grinding or refining and finally packing. Almost all of these six processes are carried out automatically except for the packing process. During the process of sending gypsum raw materials originating from outside the Palembang area, such as areas outside the city and abroad, this is what drives us to use freight transport services using barges to send goods to Palembang. Problems that occur when sending gypsum raw materials by ship are found. barges, supplying parties or as vendors do not have the means of transportation to send gypsum raw materials, this situation encourages obtaining barge transportation equipment to be uncertain, while the inventory has been calculated for safety stock, minimum inventory, maximum inventory. If the barge is not certain to be obtained, it will affect safety stock, minimum inventory and then maximum inventory Keywords – Safety stock, minimum inventory, maximum inventory
Item Type: | Monograph (Working Paper) |
---|---|
Uncontrolled Keywords: | Safety stock ; minimum inventory ; maximum inventory |
Subjects: | T Technology > TD Environmental technology. Sanitary engineering T Technology > TJ Mechanical engineering and machinery |
Divisions: | Report on Practical Work > Industrial Engineering Study Program |
Depositing User: | Philipus Fredy Novianto |
Date Deposited: | 02 May 2023 07:27 |
Last Modified: | 02 May 2023 07:27 |
URI: | http://eprints.ukmc.ac.id/id/eprint/9386 |
Actions (login required)
View Item |