PENENTUAN KEBUTUHAN TENAGA KERJA OPTIMAL PADA LINE PRODUKSI BCBC PANEL PT CAHAYA MURNI SRIWINDO DENGAN METODE WORK LOAD ANALYSIS

Saputra, Felix (2021) PENENTUAN KEBUTUHAN TENAGA KERJA OPTIMAL PADA LINE PRODUKSI BCBC PANEL PT CAHAYA MURNI SRIWINDO DENGAN METODE WORK LOAD ANALYSIS. Working Paper. Perpustakaan Universitas Katolik Musi Charitas Palembang. (Submitted)

[img] Text (Cover)
KP-TI-2020-1712013-cover.pdf

Download (323kB)
[img] Text (Abstract)
KP-TI-2020-1712013-abstract.pdf
Restricted to Registered users only

Download (10kB) | Request a copy
[img] Text (Tableofcontent)
KP-TI-2020-1712013-tableofcontent.pdf
Restricted to Registered users only

Download (500kB) | Request a copy
[img] Text (Chapter1)
KP-TI-2020-1712013-chapter1.pdf
Restricted to Registered users only

Download (441kB) | Request a copy
[img] Text (Chapter2)
KP-TI-2020-1712013-chapter2.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Chapter3)
KP-TI-2020-1712013-chapter3.pdf
Restricted to Registered users only

Download (430kB) | Request a copy
[img] Text (Chapter4)
KP-TI-2020-1712013-chapter4.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Chapter5)
KP-TI-2020-1712013-chapter5.pdf
Restricted to Registered users only

Download (1MB) | Request a copy
[img] Text (Conclusion)
KP-TI-2020-1712013-conclusion.pdf
Restricted to Registered users only

Download (149kB) | Request a copy
[img] Text (Reference)
KP-TI-2020-1712013-reference.pdf
Restricted to Registered users only

Download (106kB) | Request a copy
[img] Text (Attachment)
KP-TI-2020-1712013-attachment.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text (Complete)
KP-TI-2020-1712013-complete.pdf
Restricted to Repository staff only

Download (6MB) | Request a copy

Abstract

PT Cahaya Murni Sriwindo is a company engaged in the furniture manufacturing industry. One of the products produced from this company is a panel board cabinet manufactured by the panel department. In the BCBC Panel line production, there is one line continuous production which consists of four work stations with a different number of workers at each work station. The first work station consists of one worker. The second workstation consists of two workers. The third workstation consists of two workers. While the fourth workstation consists of one worker. There is a build-up of tasks and workers have to continue working at the fourth workstation. Therefore, it is necessary to calculate the optimal number of workers in the BCBC panel line production. From the countingresults, the standard time obtained from each work station is 4.2133 seconds, 4.3820 seconds, 9.6970 seconds, and 21.8252 seconds. Based on the standard time data for each work station, then the optimal number of workers is calculated using the Workload Analysis method, it is known that there is a need for an additional workforce of three people at the fourth workstation and a system rotation between work stations on the BCBC Panel line production is also needed. in order to be able to meet the target of 100% production demand. Keyword : Workload Analysis, BCBC Panel, Number of Workers, Work Station

Item Type: Monograph (Working Paper)
Uncontrolled Keywords: Keyword : Workload Analysis, BCBC Panel, Number of Workers, Work Station
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Report on Practical Work > Industrial Engineering Study Program
Depositing User: Maria Tiurma
Date Deposited: 23 Mar 2021 05:05
Last Modified: 23 Mar 2021 05:05
URI: http://eprints.ukmc.ac.id/id/eprint/5535

Actions (login required)

View Item View Item