Analisis Kelayakan Investasi Mesin Pembangkit Listrik Di PT Sungai Bahar Pasifik Utama

Lastina, Devi (2019) Analisis Kelayakan Investasi Mesin Pembangkit Listrik Di PT Sungai Bahar Pasifik Utama. Working Paper. Perpustakaan Universitas Katolik Musi Charitas. (Unpublished)

[img] Text
KP-TI-2019-1512002-cover.pdf

Download (185kB)
[img] Text
KP-TI-2019-1512002-abstract.pdf

Download (245kB)
[img] Text
KP-TI-2019-1512002-tableofcontent.pdf

Download (183kB)
[img] Text
KP-TI-2019-1512002-chapter1.pdf

Download (361kB)
[img] Text
KP-TI-2019-1512002-chapter2.pdf
Restricted to Registered users only

Download (667kB)
[img] Text
KP-TI-2019-1512002-chapter3.pdf
Restricted to Registered users only

Download (336kB)
[img] Text
KP-TI-2019-1512002-chapter4.pdf
Restricted to Registered users only

Download (582kB)
[img] Text
KP-TI-2019-1512002-chapter5.pdf
Restricted to Registered users only

Download (938kB)
[img] Text
KP-TI-2019-1512002-conclusion.pdf

Download (151kB)
[img] Text
KP-TI-2019-1512002-reference.pdf

Download (257kB)
[img] Text
KP-TI-2019-1512002-attachment.pdf

Download (2MB)
[img] Text
KP-TI-2019-1512002-complete.pdf
Restricted to Repository staff only

Download (2MB)

Abstract

Research was conducted in PT Sungai Bahar Pasifik Utama, Muaro Jambi, Jambi Province to determine the electrical energy generated from the rest of processing fiber and shell of palm to transmit the energy to a housing around the location factory. On this research will increase the engine power plant costs Rp 13.400.000.000 with economical life of 10 years and then analyzed using the analysis of feasibility of investment by 4 of investment valuation (Payback Period, Net Present Value, Internal Rate of Return and Profitability Index) and Break Even Point analysis. As for the results of the value is from Payback Period criterion `of 96.27 months or 8,02 years, NPV equal to Rp 1,032,376,973 (positive), IRR of 13.02% and magnitude of PI is 1.077 The calculation result of Break Even Point is the result 128.933 houses which must be received by PT SBPU amounting to Rp 18,356,164,384. Thus, the investment of electricity generation machine feasible to be implemented because it meets the requirements of economic feasibility.

Item Type: Monograph (Working Paper)
Additional Information: Kerja Praktik Lengkap dapat dibaca pada Komputer Katalog di Ruang Sirkulasi Perpustakaan UKMC Kampus Bangau.
Uncontrolled Keywords: palm oil, fiber and shell, electrical energy, investment valuation.
Subjects: Q Science > Q Science (General)
Divisions: Report on Practical Work > Industrial Engineering Study Program
Depositing User: Perpustakaan Unika Musi Charitas
Date Deposited: 29 Jan 2019 02:48
Last Modified: 04 Nov 2021 05:07
URI: http://eprints.ukmc.ac.id/id/eprint/1983

Actions (login required)

View Item View Item