Items where Author is "Biondi, David"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Item Type | No Grouping
Number of items: 1.

Biondi, David (2010) Penentuan Kapasitas Dan Kebijakan Waktu Kerja Untuk Memenuhi Permintaan Produk Tepat Waktu (Studi Kasus Di PT Pan Panel). Other thesis, Sekolah Tinggi Teknik Musi.

This list was generated on Tue May 7 02:22:47 2024 WIB.