Fang, Hui (2001) Studi Perbandingan Antara Jam Kerja Lembur Dan Tenaga Kerja Harian Untuk Meminimumkan Biaya Tenaga Kerja Dengan Pendekatan Metode Programa Dinamis Di PT Sunan Rubber Palembang. Other thesis, Sekolah Tinggi Teknik Musi.
TI-2001-296020-cover.pdf
Download (235kB)
TI-2001-296020-abstract.pdf
Download (293kB)
TI-2001-296020-tableofcontent.pdf
Download (1MB)
TI-2001-296020-chapter1.pdf
Download (1MB)
TI-2001-296020-chapter2.pdf
Restricted to Repository staff only
Download (9MB)
TI-2001-296020-chapter3.pdf
Restricted to Repository staff only
Download (1MB)
TI-2001-296020-chapter4.pdf
Restricted to Repository staff only
Download (11MB)
TI-2001-296020-chapter5.pdf
Restricted to Repository staff only
Download (1MB)
TI-2001-296020-conclusion.pdf
Download (510kB)
TI-2001-296020-reference.pdf
Download (292kB)
TI-2001-296020-attachment.pdf
Restricted to Repository staff only
Download (16MB)
TI-2001-296020-complete.pdf
Restricted to Repository staff only
Download (45MB)
| Item Type: | Thesis (Other) |
|---|---|
| Additional Information: | Apabila membutuhkan skripsi lengkap dapat menghubungi petugas Perpustakaan |
| Subjects: | T Technology > TS Manufactures |
| Divisions: | Theses - S1 > Industrial Engineering Study Program |
| Depositing User: | Perpustakaan Unika Musi Charitas |
| Date Deposited: | 26 Apr 2019 06:08 |
| Last Modified: | 26 Apr 2019 06:08 |
| URI: | https://eprints.ukmc.ac.id/id/eprint/2487 |
