indra wijaya, indra wijaya Analisis Kapasitas Produksi Menggunakan Metode Rought Cut Capacity Planning (RCCP) Pada UMKM Batu Bata Jaya Lestari. Project Report. Universitas Katolik Musi Charitas.
KP-TI-2026-2312004-cover.pdf
Download (254kB) | Preview
KP-TI-2026-2312004-tableofcontent.pdf
Restricted to Registered users only
Download (354kB)
KP-TI-2026-2312004-abstract.pdf
Restricted to Registered users only
Download (212kB)
KP-TI-2026-2312004-chapter1.pdf
Restricted to Registered users only
Download (451kB)
KP-TI-2026-2312004-chapter2.pdf
Restricted to Registered users only
Download (446kB)
KP-TI-2026-2312004-chapter3.pdf
Restricted to Registered users only
Download (420kB)
KP-TI-2026-2312004-chapter4.pdf
Restricted to Registered users only
Download (378kB)
KP-TI-2026-2312004-chapter5.pdf
Restricted to Registered users only
Download (832kB)
KP-TI-2026-2312004-conclusion.pdf
Restricted to Registered users only
Download (295kB)
KP-TI-2026-2312004-reference.pdf
Restricted to Registered users only
Download (218kB)
KP-TI-2026-2312004-attachment.pdf
Restricted to Registered users only
Download (625kB)
KP-TI-2026-2312004-complete.pdf
Restricted to Repository staff only
Download (918kB)
Abstract
Batu Bata Jaya Lestari is a micro, small, and medium enterprise (MSME) engaged in red brick production. As market demand increases, production capacity planning, which has so far relied only on experience, has not been able to provide accurate information on capacity adequacy at each work center. This study aims to analyze production capacity adequacy using the Rough Cut Capacity Planning (RCCP) method. The stages include demand forecasting using Trend Analysis (Least Square), preparation of the Master Production Schedule (MPS) and Bill of Resources (BOR), calculation of available capacity, and analysis of capacity requirements at each work center.
The results show that the raw material processing, molding, drying, and transportation and storage work centers have sufficient capacity. However, the firing work center is overloaded, so an increase in working hours is proposed so that the available capacity can meet production requirements. The RCCP method proves helpful for the company in evaluating capacity adequacy, identifying potential bottlenecks, and serving as a basis for capacity planning decisions.
Keywords: Rough Cut Capacity Planning (RCCP), Production Capacity, Master Production Schedule (MPS), Bill of Resources (BOR), Work Center
| Item Type: | Monograph (Project Report) |
|---|---|
| Subjects: | K Law > K Law (General) |
| Depositing User: | Indra Wijaya |
| Date Deposited: | 17 Nov 2026 02:54 |
| Last Modified: | 17 Nov 2026 02:54 |
| URI: | https://eprints.ukmc.ac.id/id/eprint/16878 |
