Items where Division is "Theses - S1 > Industrial Engineering Study Program" and Year is 2009

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Jump to: P | S
Number of items: 4.

P

Perdana, Andry Tri (2009) PENENTUAN WAKTU ISTIRAHAT SOPIR BUS AKAP TRAYEK PALEMBANG - JAMBI GUNA MENGURANGI KECELAKAAN KERJA DI JALAN RAYA (Studi Kasus pada PO. IMI Palembang). Undergraduate thesis, Univesitas Katolik Musi Charitas Palembang.

Prayoga, Riyo (2009) Studi Profitabilitas Dengan Menggunakan Simulasi Monte Carlo Di PT Shima Prima Utama Palembang. Other thesis, Sekolah Tinggi Teknik Musi.

S

Sibagariang, Imelda Richa B. (2009) Pengaruh Night And Shift Works (NSWs) Terhadap Kondisi Fisik, Psikologis, Dan Beban Kerja. Other thesis, Sekolah Tinggi Teknik Musi.

Solihin, Julyani (2009) Usulan Implementasi 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) Pada Bagian Bengkel (Studi Kasus Di PT Muara Kelingi II). Other thesis, Sekolah Tinggi Teknik Musi.

This list was generated on Wed Apr 24 11:37:35 2024 WIB.