Prakoso, Vincensius Indra (2023) PERANCANGAN TATA LETAK FASILITAS KERJA MENGGUNAKAN METODE ARC DAN ARD (STUDI KASUS ASSEMBLY HOSPITAL PT SHIMA PRIMA UTAMA). Project Report. Perpustakaan Universitas Katolik Musi Charitas Palembang, Palembang. (Submitted)
Text (Cover)
KP-TI-2023-1912004-Cover.pdf Download (182kB) |
|
Text (Abstract)
KP-TI-2023-1912004-Abstract.pdf Restricted to Registered users only Download (129kB) | Request a copy |
|
Text (Tabel Of Content)
KP-TI-2023-1912004-Tabel Of Content.pdf Restricted to Registered users only Download (196kB) | Request a copy |
|
Text (Chapter 1)
KP-TI-2023-1912004-Chapter 1.pdf Restricted to Registered users only Download (220kB) | Request a copy |
|
Text (Chapter 2)
KP-TI-2023-1912004-Chapter 2.pdf Restricted to Registered users only Download (490kB) | Request a copy |
|
Text (Chapter 3)
KP-TI-2023-1912004-Chapter 3.pdf Restricted to Registered users only Download (267kB) | Request a copy |
|
Text (Chapter 4)
KP-TI-2023-1912004-Chapter 4.pdf Restricted to Registered users only Download (305kB) | Request a copy |
|
Text (Conclusion)
KP-TI-2023-1912004-Conclusion.pdf Restricted to Registered users only Download (872kB) | Request a copy |
|
Text (Reference)
KP-TI-2023-1912004-Reference.pdf Restricted to Registered users only Download (107kB) | Request a copy |
|
Text (Attachment)
KP-TI-2023-1912004-Attachment.pdf Restricted to Registered users only Download (864kB) | Request a copy |
|
Text (Complete)
KP-TI-2023-1912004-Complete.pdf Restricted to Repository staff only Download (2MB) | Request a copy |
Abstract
In improving company performance, one of the important things is work productivity because it can affect the results of the work and affect the services that can be offered by the company. Productivity itself can be influenced by several things, such as the work methods applied, physical boundaries by the workers themselves, supporting machines from the work itself, the materials / raw materials of the work itself, and also the work environment used to do the work. PT Shima Prima Utama itself, after observation, found that there were things that had not been optimized for productivity improvement, especially in the assembly hospital field which affected the way workers working in this field. ARC (Activity Relationship Chart) and also ARD (Activity Relationship Diagram) are one of the ways that can be used to arrange layouts based on the relationships between spaces observed and obtained in scale. The making of ARC and ARD is carried out based on observations and interviews with workers there to get an accurate scale so that the design of this layout can increase the productivity of workers at the Assembly Hospital itself. Keywords: Facility Layout, Activity Relationship Diagram, Activity Relationship Chart
Item Type: | Monograph (Project Report) |
---|---|
Uncontrolled Keywords: | Facility Layout ; Activity Relationship Diagram ; Activity Relationship Chart |
Subjects: | L Education > LT Textbooks |
Divisions: | Report on Practical Work > Industrial Engineering Study Program |
Depositing User: | Users 2304 not found. |
Date Deposited: | 13 Apr 2023 03:09 |
Last Modified: | 18 Apr 2023 02:29 |
URI: | http://eprints.ukmc.ac.id/id/eprint/9390 |
Actions (login required)
View Item |