Sari, Fiona Wilda (2022) Pekerjaan Konstruksi Kolom dan Balok Pada Gedung Kantor PT. Perdana Abadi Perkasa Palembang. Working Paper. Perpustakaan UKMC, Palembang. (Submitted)
Text (Cover)
KP-ARS-2021-1811009-cover.pdf Download (23kB) |
|
Text (Abstract)
KP-ARS-2021-1811009-abstract.pdf Restricted to Registered users only Download (29kB) | Request a copy |
|
Text (Tableofcontent)
KP-ARS-2021-1811009-tableofcontent.pdf Restricted to Registered users only Download (107kB) | Request a copy |
|
Text (Chapter1)
KP-ARS-2021-1811009-chapter1.pdf Restricted to Registered users only Download (44kB) | Request a copy |
|
Text (Chapter2)
KP-ARS-2021-1811009-chapter2.pdf Restricted to Registered users only Download (699kB) | Request a copy |
|
Text (Chapter3)
KP-ARS-2021-1811009-chapter3.pdf Restricted to Registered users only Download (617kB) | Request a copy |
|
Text (Chapter4)
KP-ARS-2021-1811009-chapter4.pdf Restricted to Registered users only Download (1MB) | Request a copy |
|
Text (Conclusion)
KP-ARS-2021-1811009-conclusion.pdf Restricted to Registered users only Download (34kB) | Request a copy |
|
Text (Reference)
KP-ARS-2021-1811009-reference.pdf Restricted to Registered users only Download (142kB) | Request a copy |
|
Text (Attachment)
KP-ARS-2021-1811009-attachment.pdf Restricted to Registered users only Download (11MB) | Request a copy |
|
Text (Complete)
KP-ARS-2021-1811009-complete.pdf Restricted to Repository staff only Download (15MB) | Request a copy |
Abstract
Architecture is both an art and a science in designing buildings. The process of designing a building includes several processes covers design, construction, structure, and aspects of beauty. The presence of an architect is needed during the construction process to oversee development, therefore architectural students who are just learning to design are expected to have real experience about designing buildings through practical work before having the real work. The writing of this practical work report discusses the stages of the construction work process, especially the column and beam structure in the construction of the PT. Perdana Abadi Perkasa office bulding. The activities carried out in the observations are ironing processes to casting of column and beam structures. The results obtained are the stages of construction of column and beam structures as well as comparative analysis of column and beam construction work based on the theory learned and field observations. Keywords: construction work, column and beam, office building
Item Type: | Monograph (Working Paper) |
---|---|
Uncontrolled Keywords: | construction work, column and beam, office building |
Subjects: | N Fine Arts > NA Architecture |
Divisions: | Report on Practical Work > Architecture Engineering Study Program |
Depositing User: | Fiona Wilda Sari |
Date Deposited: | 08 Feb 2022 05:41 |
Last Modified: | 08 Feb 2022 06:18 |
URI: | http://eprints.ukmc.ac.id/id/eprint/6972 |
Actions (login required)
View Item |