ANALISIS PROGRAM KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN METODE 5S PADA UKM ARETA AGUNG

Alamsyah, Firman (2021) ANALISIS PROGRAM KESELAMATAN DAN KESEHATAN KERJA (K3) DENGAN METODE 5S PADA UKM ARETA AGUNG. Working Paper. Perpustakaan Universitas Katolik Musi Charitas Palembang. (Submitted)

[img] Text (Cover)
KP-TI-2021-1712026-cover.pdf

Download (90kB)
[img] Text (Abstract)
KP-TI-2021-1712026-abstract.pdf
Restricted to Registered users only

Download (84kB) | Request a copy
[img] Text (Tableofcontent)
KP-TI-2021-1712026-tableofcontent.pdf
Restricted to Registered users only

Download (175kB) | Request a copy
[img] Text (Chapter1)
KP-TI-2021-1712026-chapter1.pdf
Restricted to Registered users only

Download (149kB) | Request a copy
[img] Text (Chapter2)
KP-TI-2021-1712026-chapter2.pdf
Restricted to Registered users only

Download (292kB) | Request a copy
[img] Text (Chapter3)
KP-TI-2021-1712026-chapter3.pdf
Restricted to Registered users only

Download (256kB) | Request a copy
[img] Text (Chapter4)
KP-TI-2021-1712026-chapter4.pdf
Restricted to Registered users only

Download (300kB) | Request a copy
[img] Text (Chapter5)
KP-TI-2021-1712026-chapter5.pdf
Restricted to Registered users only

Download (296kB) | Request a copy
[img] Text (Conclusion)
KP-TI-2021-1712026-conclusion.pdf
Restricted to Registered users only

Download (6kB) | Request a copy
[img] Text (Reference)
KP-TI-2021-1712026-reference.pdf
Restricted to Registered users only

Download (152kB) | Request a copy
[img] Text (Attachment)
KP-TI-2021-1712026-attachment.pdf
Restricted to Registered users only

Download (2MB) | Request a copy
[img] Text (Complete)
KP-TI-2021-1712026-complete.pdf
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

SME Areta Agung is one of the business fields engaged in the construction industry. The products produced are bricks and paving blocks. In a business, a neat, clean, and comfortable production floor will affect the performance of workers and minimize the risk of work accidents that can occur at any time. The condition of occupational safety and health program (K3) on the product floor at SME Areta Agung has not been organized and unorganized so that it can have an impact on causing work accidents. In addition, the implementation of 5S is also not well structured. 5S is a method of structuring the work environment originating from Japan. 5S stands for Seiri, Seiton, Seiso, Seiketsu, and Shitsuke which can be interpreted as 5R which is Ringkas, Rapi, Resik, Rawat and Rajin. This method will also provide a repair solution that will be applied so that the condition of the production floor becomes standard and comfortable for the workers. The actual assessment has not met the proper standards, therefore there must be some improvement in some places based on the draft proposal. Keywords: 5S Method, Occupational Safety and Health (K3), Work Environment

Item Type: Monograph (Working Paper)
Uncontrolled Keywords: Keywords: 5S Method, Occupational Safety and Health (K3), Work Environment
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Report on Practical Work > Industrial Engineering Study Program
Depositing User: Maria Tiurma
Date Deposited: 23 Mar 2021 06:48
Last Modified: 24 Mar 2021 04:29
URI: http://eprints.ukmc.ac.id/id/eprint/5537

Actions (login required)

View Item View Item