Sianturi, Sanda Yanto Brata (2012) Pengaruh Pengetahuan Akuntansi Dan Jiwa Kewirausahaan Terhadap Penggunaan Informasi Akuntansi Dalam Pengambilan Keputusan Investasi. Other thesis, Sekolah Tinggi Teknik Musi.
Text
TI-2012-206009-cover.pdf Download (49kB) |
|
Text
TI-2012-206009-abstract.pdf Download (871kB) |
|
Text
TI-2012-206009-tableofcontent.pdf Download (6MB) |
|
Text
TI-2012-206009-chapter1.pdf Download (2MB) |
|
Text
TI-2012-206009-chapter2.pdf Restricted to Repository staff only Download (19MB) |
|
Text
TI-2012-206009-chapter3.pdf Restricted to Repository staff only Download (3MB) |
|
Text
TI-2012-206009-chapter4.pdf Restricted to Repository staff only Download (22MB) |
|
Text
TI-2012-206009-chapter5.pdf Restricted to Repository staff only Download (1MB) |
|
Text
TI-2012-206009-conclusion.pdf Download (888kB) |
|
Text
TI-2012-206009-reference.pdf Download (888kB) |
|
Text
TI-2012-206009-attachment.pdf Restricted to Repository staff only Download (3MB) |
|
Text
TI-2012-206009-complete.pdf Restricted to Repository staff only Download (1MB) |
|
Text
TI-2012-206009-summary_id.pdf Restricted to Repository staff only Download (260kB) |
Abstract
PT Sintong Makmur Abadi Palembang is one company that is engaged in the workshop. Scheduling of production is often disrupted due to a sudden demand for other products with the same due date or sooner, leading to the demand / customer orders can not be fulfilled. this is very detrimental to the company because of the cost of production, production time, the production process has changed the schedule of the planned and kridibilitas company. It needs to make a production schedule that can help in making decisions to minimize the delay in the completion of the request / order. In this study designed a scheduling using the Forward and Backward Scheduling algorithm Sheduling shift job. To produce a minimum delay time Sintong Makmur Abadi PT Palembang need to do scheduling with the method of Forward Scheduling algorithm shifts in the job scheduling process and degsel engine block. The resulting makespan of 385 minutes, with a time delay of 90 minutes and the total cost of the manufacturing process is $ 527,222
Item Type: | Thesis (Other) |
---|---|
Additional Information: | Skripsi Lengkap dapat dibaca di Ruang Referensi Perpustakaan UKMC Kampus Bangau. |
Uncontrolled Keywords: | Scheduling Forward, Backward Sheduling, Scheduling Algorithm Shifting Job. |
Subjects: | Q Science > Q Science (General) |
Divisions: | Theses - S1 > Industrial Engineering Study Program |
Depositing User: | Perpustakaan Unika Musi Charitas |
Date Deposited: | 16 Jan 2019 02:19 |
Last Modified: | 16 Jan 2019 02:19 |
URI: | http://eprints.ukmc.ac.id/id/eprint/1881 |